|

Attacked by vandals during refurbishment.
Whilst the signalbox was being refurbished vandals smashed the main windows on the front and West end of the box during the night of 3rd-4th June..
Set 1
Image 1-1: Hamworthy Box, Main windows boarded over.
Image 1-2: New toilet facility on East end of box. East end windows still intact.
Image 1-3: New supports for toilet extension. New Loo Christened 24-May-2002.
Image 1-4: Viewed from East end of Down platform.

Set 2
Image 2-1: Barrel of junk/scrap from works on the box.
Image 2-2: New lintel over left hand interlocking room window.
Image 2-3: Fresh filler, still soft.
Image 2-4: View from Down Loop platform.

Set 3
Image 3-1: Viewed from South side of underpass looking at the rear (branch line side) of the box.
Image 3-2: Rodding tunnel where rodding and signal wire runs used to exit from the box to control the many points and signals in use when Hamworthy was a busy junction station in Southern Railway steam days.
Image 3-3: View of station from West end of Up platform.


6th June 2002. The windows were replaced this morning and the signal box is now back in use and looking good.

Return to Hamworthy Signalbox page.
Copyright Notes