|

Img: wjb29may03.jpg - 29th May 2003.
The LSWR box type wooden ventilator was removed and the roof patched with new slates on 19th & 20th of May. The original window frames have been removed and replaced with modern PVC covered extruded aluminium framed double glazing panels. The old window frames have been scrapped. The wooden horizontal boarding above the operating floor is being replaced with PVC cladding.


Copyright Notes