|
|
|
|
|
Tuzla
International Airport
Terminal building
21.07.2003.
Photographer
A.Hamzic
|
|
|
Tuzla
International Airport
Terminal building inside
21.07.2003.
Photographer
A.Hamzic
|
|
|
Tuzla
International Airport
Terminal building and apron
21.07.2003.
Photographer
A.Hamzic |
|
|
Malev
Hungarian Airlines
Fokker-70
HA-LMD
21.07.2003.
Photographer
N.N. |
|
|
Sarajevo
International Airport
TUNEL DOBRINJA- BUTMIR was built by hand under the airport runways from
March 1992 until July 1993. The length of this tunnel is 720 metres.
During the 4 years that the city was under attack, this tunnel was the only
means of going in and out of Sarajevo.
21.07.2003.
Photographer:A.Hamzic
|
|
|
Sarajevo
International Airport
TUNEL DOBRINJA- BUTMIR was built
by hand under the airport runways from March 1992 until July 1993. The length
of this tunnel is 720 metres. During the 4 years that the city was under attack,
this tunnel was the only means of going in and out of Sarajevo.
21.07.2003.
Photographer:A.Hamzic
|
|
|
-
-
-
-
-Photographer
-
|
|
|
|