|
Contact Me
|
The layout is a working Skittle mine. Skittles (the candy) are loaded into dump cars at the mine tipple & transported via switchbacks to a dump bin that routes the Skittles into a paper cup for consumption, The Layout is available for public engagements.
Setup & requirements: The layout is 10 feet by 2 feet and breaks down into 2 equaly sized pieces. It is operated by one person from behind the layout with the public accessing along the front. Traffic flow is best if it is from right to left, if viewed from behind the layout looking across it. Electricity is required to operate the layout, 110vac with 1amp draw. Supervision of children in the area is required. Set up or take down time is 15 to 30 minutes. Access by a 2 wheel cart is needed to set up alone, long stairs require some assistance. Modules weigh about 50 lb. each and are not difficult to handle. I have stands for display but if (2) 6' or 8' long standard folding banquet tables of the same height, within 1/4 inch, could be provided it saves a lot of setup and hauling. I have dark green felt skirts for the tables. Please indicate if the stands will be required as I normally do not pack them. The layout is stored in Gettysburg, PA, USA.
Jim Macintyre
jdmaci@earthlink.net
|