|
==---===---===---===-------===---
++Transmission record++
Time sent: 17:08:24_3/15/57 (Gst)
Recieved at: Tc-FTL relay # 239476
Relayed to: RSF Communications
relay center 46
Arrived at: 04:56:08_3/16/57 (Gst)
Transmission cost: Uc$12.14
+==+==begin text ==+==+==+==+==+
From: Captain
Evharsen
To: RSF investigations
department.
It had been
approximatly 2 weeks since RSF Gravlaw experienced a minor emergency situation.
After a full investigation, the official reason for the accident was a
failed sensor (catalog no. En-464l577h3484) which had not detected the
slow corrosion of the power infeed to Magnetic Generator number four. The
subsequent failure of the generator after a restart of the engine
had caused a fault in the magnetic thrust funnel, shunting thrust off to
one side instead of straight back as it should have. The resulting thrust
aberration forced the ship into a rotation which lasted around two minutes
during which the stress upon the hull reached a level of 128% of maximum
recommended hull stess. The ship proved unresponsive to bridge control
during the incident, the cause of which is still under investigation. Minor
stress damage to the hull was done, as well as the formation of a crack
in the Reaction mass containment tube, which has been sealed. Minor crew
injuries have all been treated. Due to this incident, our arrival to our
destination will be delayed by approximatly 2 weeks.
+==+==end text+==+==+==+==+==+==+